A little refining to do but the pieces are taking shape.
The profile is secured to the brass with double sided tape. I drill out the enclosed areas with an end mill.
Then I moved to the band saw and cut around the profile.
After the profile is outlined it's file file file and sand sand sand.
Started milling out the SCNY Medallions.
I mixed up some black epoxy and filled the relief with it.
I milled and filed the surface. I will need a second application to fill the gaps that didn't flow.
I think the overall-effect works though.
Here is the medallion after the second round of epoxy fill.
Here is the entire structure that gets mounted to the post
The medallion is mounted opposite the Height Adjustment pin.
Here are the pieces formed and set into the posts
Brass for the Desk rods.These piece are made to capture the 1/4 inch brass rods and are set into the Desk Frames of the Music Stands. Click the Picture and scroll down to see more.